
T&Cs and Price Sheets
Contract Documents at a Glance
Transparent contractual terms for shippers and downstream network operators: Here, we provide centralized access to our current documents such as Terms and Conditions and Price Sheets.
Shippers
Terms and Conditions
effective October 1, 2026
effective April 1, 2026
Further information


Market information natural gas/biogas / pdf / 56.83 KB
Supplementary Terms and Conditions of Open Grid Europe GmbH
Supplementary Terms and Conditions of Open Grid Europe GmbH - Section 8 on separate process for bundled nominations (Section 12 (13) of Entry / Exit Contract) - Overview of bundled nomination …pursuant to Regulation (EU) No. 984/2013 at cross-border interconnection points.

Market information natural gas/biogas / pdf / 502.15 KB
CBP (2014-001/01): Harmonisation of the Nomination and Matching Process for Double-Sided and Single-Sided Nomination
CBP (2014-001/01): Harmonisation of the Nomination and Matching Process for Double-Sided and Single-Sided Nomination: The following Common Business Practice (CBP) has been approved by EASEE-gas for …use in gas business transactions across connection points and constitutes recommendations for the part of the process which relates specifically to (re-)nominations and involves shippers on one hand, and system operators on the other hand. This CBP reflects minimum requirements in line with the network codes in the areas referred to in Article 8(6) of the Regulation (EC) 715/20091. This CBP does not exclude additional provisions between individual parties
Price Sheets
effective January 1, 2027


effective January 1, 2026


Price sheets that were valid prior to the current calendar year can be found in our media library.
Network Operators
Terms and Conditions
effective October 1, 2026
effective January 1, 2026
Further information
Price Sheets
effective January 1, 2027


effective January 1, 2026


Price sheets that were valid prior to the current calendar year can be found in our media library.
(Technical) Connection Conditions

Market information natural gas/biogas / pdf / 623.60 KB
Minimum technical requirements
Apart from the network connection conditions, the MTRs also includes binding requirements and recommendations for the safe, efficient and cost-effective implementation of technical rules and …regulations for the installation, modification and operation of gas pressure regulating and metering systems connected to Open Grid Europe’s gas grid. (only in German). Status 28 September 2026

Network connection, Metering point operation natural gas/biogas / pdf / 0.98 MB
Network interconnection contract
Pursuant to Article 7 of the Gas Network Access Ordinance, network operators have to sign network interconnection contracts with operators of networks to which they are connected via a network …interconnection point. The specimen network interconnection contract published by Open Grid Europe is based on the provisions of Section 2 of Part 3 (Articles 26-31) and of Part 5 (Articles 52-62) of the Agreement on Cooperation between Operators of Gas Supply Networks Located in Germany as Amendement from 22nd March 2024 (KoV XIV), which is attached to the contract as Annex 5 for information. Annexes 1 to 4 of the network interconnection contract describe in more concrete terms the provisions of Section 2 of Part 3 (Articles 26-31) of the KoV XIV as provided in Article 26, Section 3 of KoV XIV. The supplementary provisions describe, in particular, the exact location of the network interconnections (Annex 1), their combination (where applicable) into exit zones (Annex 4) and the technical framework applicable to the relevant network interconnection and/or the relevant exit zone (only in German).
You can find additional contract documents in our media library.




















