Media library

In our media library you have access to documents, photo and graphic material. Filter conveniently by category and/or year or enter a term in the search field. Find all videos about our company, our products and services in the video overview.

Internal order / xlsx / 66.73 KB

Internal order capacity data for 2025

contains information from joint pipelines (only in German)

Press releases / pdf / 167.09 KB

New MoU paves the way for hydrogen supply chain in Central Europe

A recent Memorandum of Understanding (MoU) signed between FluxSwiss, Transitgas, OGE, Fluxys TENP and Snam. marks a significant step towards enhancing hydrogen supply in Central Europe, particularly in Baden-Württemberg, Germany and northwestern Italy.

Price sheet, Network access natural gas/biogas / pdf / 784.67 KB

Network access conditions, applicable from 1st January 2025

General Terms & Conditions for Entry/Exit Contracts (entry/exit system) version 14.1 (30.11.2024), applicable from 1st January 2025

Price sheet, Network access natural gas/biogas / pdf / 86.38 KB

Supplementary terms and conditions

Supplementary terms and conditions of Open Grid Europe GmbH for internal orders for downstream network operators as of 01.01.2025 – published on 30.10.2024 (only in German)

Price sheet, Network access natural gas/biogas / pdf / 803.33 KB

Comparison version of the network access conditions version 14/14.1

Version 14 / 14.1

Press releases / pdf / 123.07 KB

OGE hosts Energiepolitischen Dialog Berlin: ‘Moving from talk to action on hydrogen.’

At its 13th Energiepolitischer Dialog (Energy Policy Dialogue) entitled ‘From talk to action: Quo vadis H2 core network for the green transformation?’, OGE examined the current state of play in the hydrogen sector.

Press releases / jpg / 2.49 MB

Press photo: OGE hosts Energiepolitischen Dialog Berlin: ‘Moving from talk to action on hydrogen.’

f. l.: Dr. Andreas Breuer (Head of Hydrogen at Westenergie AG), Nina Scholz (Country Manager Germany at Equinor), Dr. Thomas Hüwener (CEO of OGE), Inka Schneider (Moderator), Dr. Arnd Köfler (Member of the Supervisory Board of Hüttenwerke Krupp Mannesmann), Dr. Axel Bree (Federal Ministry for Economic Affairs and Climate Action)

Call for tenders / pdf / 368.70 KB

OGE Fuel Gas Tender 2025

Overview of the tender, Offer Sheets Bands & Structures, The nomination process, Documents for prequalification

Others / pdf / 116.12 KB

Technical safety management system

Technical safety management (TSM) certification (only in German)

Brochure / pdf / 2.82 MB

Our compressor stations

Status October 2024 (only in German)

Market information natural gas/biogas / pdf / 92.62 KB

Communication data sheet of Open Grid Europe

Form / pdf / 81.33 KB

Request for an individual assessment

We could not book firm capacities in line with an online-request / booking via PRISMA. Therefore, we request – with reference to Section 2 of Appendix 2 of the „General Terms & Conditions for the Entry/Exit Contracts (entry/exit system) as amended from time to time (hereinafter called „General Terms & Conditions“) – a binding individual capacity assessment including the following data

Price sheet, Network access natural gas/biogas / xlsx / 253.95 KB

Fees charged by Open Grid Europe GmbH according to Section 21 (3) sentence 2 EnWG (automated readout)

Vaild from 01 January 2025, 06:00 a.m., until 01 January 2026, 06:00 a.m.

Price sheet, Network access natural gas/biogas / pdf / 732.68 KB

Price Sheet of Open Grid Europe GmbH for entry and exit contracts as well as internal orders in accordance with Cooperation Agreement XIV

Valid for gas shipments from 1 January 2025

Image / jpg / 1.77 MB

Dr. Thomas Hüwener

Chairman of the Board of Management at Open Grid Europe GmbH (CEO)

Image / jpg / 1.57 MB

Detlef Brüggemeyer

Member of the Board of Management at Open Grid Europe GmbH, Focus Technology

Press releases / pdf / 143.32 KB

OGE and Thyssengas put ZEELINK compressor station near Legden into operation

Nathanael Liminski, Minister for Federal and European Affairs and Media of the state of North Rhine-Westphalia, attended the official commissioning of the compressor station.

Press releases / jpg / 2.90 MB

Press photo: OGE and Thyssengas put ZEELINK compressor station near Legden into operation

Ceremonial commissioning of the compressor station with Dr. Thomas Gößmann (Thyssengas GmbH), Minister Nathanael Liminski and Dr. Thomas Hüwener (OGE) ( l. to r.)

Price sheet, Network access natural gas/biogas / pdf / 780.73 KB

Network access conditions, applicable from 1st October 2024

General Terms & Conditions for Entry/Exit Contracts (entry/exit system) version 14 (22.03.2024), applicable from 1st October 2024

Price sheet, Network access natural gas/biogas / pdf / 907.69 KB

Comparison version of the network access conditions version 13.1/14

version 13.1 / version 14