Press releases 

Here you will find our latest press releases. Filter conveniently by category and/or year or enter a term in the search field. 

14 May 2024

Detlef Brüggemeyer to become new technical managing director of OGE

OGE has successfully arranged the succession for the position of technical managing director: OGE's Supervisory Board has ap-pointed Detlef Brüggemeyer as a member of OGE's Management Board.

29 April 2024 / Cooperation

Rhineland-Palatinate: Secure energy supply today and tomorrow

Minister President Malu Dreyer visits the construction site of the TENP long-distance gas pipeline

23 April 2024

Carbon Management:
Signing of a Memorandum of Understanding between Equinor and OGE

In the presence of the Federal Minister, Dr. Robert Habeck MdB, and the Norwegian Energy Minister, Terje Aasland, Dr. Jörg Bergmann, CEO of OGE, and Irene Rummelhoff, Executive Vice President at Equinor ASA, signed a letter of intent as part of the North Sea Dialogue.

26 March 2024

"Safe, meaningful and progressive": OGE publishes its sustainability report for the 2023 financial year

OGE publishes its sustainability report for the 2023.

22 March 2024

OGE puts its TransHyDE H2 laboratory – which is unique in Germany – into operation

Within the span of two years, OGE has planned, built and commissioned its innovative TransHyDE H2 laboratory in Essen. The TransHyDE project is one of three flagship hydrogen projects funded by the German Ministry of Education and Research.

20 March 2024 / Cooperation

Energy supplier alliance gives go-ahead for regional hydrogen distribution network in Frankfurt/Rhine-Main

Metropolitan region to receive hydrogen regional network Rh2ein-Main Connect.

2 February 2024 / Cooperation

The H2med project is entering a new phase of its development.

The three developing partners of the BarMar project, Enagás, GRTgaz and Teréga, in coordination with OGE, have decided to award the Wood company to conduct the preliminary engineering studies, perform the analysis of route alternatives and select the corridor of the BarMar project.

25 January 2024

Dr. Thomas Hüwener becomes Spokesman of the Management Board of OGE

OGE hat die Nachfolge des bisherigen CEO Dr. Jörg Bergmann frühzeitig geregelt: Dr. Thomas Hüwener wird am 01. Juli 2024 Sprecher der Geschäftsführung.

4 October 2023

Success in energy supply: OGE completes connection pipe-line to second floating LNG terminal in Wilhelmshaven

Germany's leading transmission system operator OGE once again demonstrates speed and reliability in the construction of major infrastructure. With the successful completion of the “Wilhelmshaven-Anbindungsleitung II (WAL II)”, including a gas pressure regulator station, OGE continues to secure Germany's stable natural gas supply in the future - the pipeline is also, like WAL I - suitable for the transport of hydrogen.

8 August 2023 / Cooperation

Research project on hydrogen storage launched

Bierwang porous rock storage is being tested for its feasibility as a hydrogen storage facility. Commissioning begins with first hydrogen storage. Hydrogen storage essential for the decarbonization of the European energy market.

OGE grants the users the right to use, store and reproduce the texts, images and graphics provided in the press kit in whole or in part for journalistic purposes within the scope of the applicable press and copyright law, whereby OGE must be named as source/author. The use and reproduction of the OGE logo requires the prior consent of OGE.

Our press kit for download 

Use the press kit here to secure essential building blocks for reporting on our company: our logo, pictures of our managing directors, our headquarter and more.